If your website runs on Umbraco 13, the next upgrade deserves a place on your development calendar. Umbraco 13 is in its security-only phase and reaches end of life on 14 December 2026. Umbraco 17 is the current long-term support (LTS) release, with support scheduled until 27 November 2028.
You can move directly from Umbraco 13 to 17. That does not mean every website can be upgraded by changing a package version and pressing deploy. The database migration may be handled by Umbraco, while your custom code, packages, backoffice extensions and integrations still need assessment and testing.
This guide explains what to check, how to choose an upgrade route and what to test before the new version goes live.
Can you upgrade directly from Umbraco 13 to 17?
Yes. Umbraco supports a direct move from one LTS release to the next. You do not need to put versions 14, 15 and 16 into production one by one to reach 17. Their breaking changes still matter, though, because your application has to work with the APIs and backoffice architecture in the target version.
For a site with little customisation and compatible packages, upgrading the existing solution may be sensible. A site with extensive backoffice extensions or older implementation choices may need a larger code update. In some cases, building a fresh Umbraco 17 solution and moving content and schema across is the cleaner route. Neither choice can be made reliably from the version number alone.
Why this upgrade needs a closer look
The largest change between versions 13 and 17 arrived with Umbraco 14. Umbraco replaced the AngularJS-based backoffice with a new architecture using Web Components and introduced a new extension model. If your editors use custom dashboards, property editors or other bespoke backoffice tools, those features need particular attention. Existing server-side code and third-party packages must also be checked against the supported APIs and versions.
An upgrade assessment should identify what the site actually uses before anyone estimates the work. A standard content website and a platform connected to a CRM, commerce system and several custom editorial tools will have very different plans.
What to check before upgrading
Custom code and backoffice extensions
List your custom controllers, APIs, notification handlers, search components, scheduled jobs, dashboards and property editors. Record which ones editors or other systems depend on. Then check the relevant breaking changes across the intervening major releases. Custom backoffice extensions often need the most rework in this upgrade.
Packages and Umbraco products
Inventory every third-party package and confirm there is a version compatible with Umbraco 17. Include products such as Umbraco Forms, Deploy or Commerce if your site uses them. For anything without a compatible release, decide whether to replace it, rebuild the needed functionality or change the workflow before committing to an upgrade timetable.
Hosting and deployment
Check the target .NET runtime, hosting support, configuration, environment variables, build process and deployment pipeline. A successful local upgrade is only part of the job if production runs on a different setup. Establish how the database and media will be backed up and how you would restore service if deployment fails.
Content, media and integrations
Review content volume, media storage, redirects, multilingual content and any external systems that read from or write to Umbraco. Identify forms, search, authentication, CRM connections, payment or commerce flows, and scheduled imports. These are practical test cases for the new site, not merely items on an inventory.
Two routes from Umbraco 13 to 17
Route 1: Upgrade the existing solution
Update the application and its dependencies, adapt incompatible code and packages, and run the Umbraco migrations against a copy of the website database. This can preserve more of the current implementation and may suit a well-maintained project with understood dependencies.
The trade-off is that the new version can carry forward old code and design decisions. The team should still review which parts are worth retaining.
Route 2: Build a fresh Umbraco 17 solution
Set up a new application, rebuild the required functionality and move the relevant content and schema through a planned migration process. This may suit a site whose custom extensions, content model or deployment setup need substantial work anyway. Umbraco describes Umbraco Deploy import/export as one option for moving content and schema; its fit depends on the project and licensing or hosting arrangement.
This route gives the team room to clean up the implementation, but it needs careful mapping, migration rehearsals and validation. A fresh build should not be described as a simple automatic content transfer.
How do you choose? Compare the cost and risk of adapting the existing site with the cost and risk of rebuilding the affected parts. Check the condition of the codebase, package compatibility, editorial requirements and the amount of content to migrate. The right route should come out of that assessment.
A practical upgrade sequence
- Audit the current site. Confirm its exact Umbraco version, dependencies, custom features, hosting and integrations. Agree which existing behaviour must be preserved.
- Choose the route and scope. Decide whether to update the current solution or build fresh. Record package replacements, code changes, content migration needs and acceptance criteria.
- Prepare a safe environment. Back up the database, media and code. Work with representative copies and establish a tested restore procedure before running migrations.
- Update the application. Bring the runtime, Umbraco packages and compatible dependencies to their target versions. Address breaking changes and rebuild backoffice extensions where needed.
- Rehearse the migration. Run the database or content migration in a non-production environment. Record errors, timings and any manual steps so the live release can be planned accurately.
- Test with developers and editors. Check page rendering, publishing, preview, media, permissions, forms, search, integrations and the workflows your editors use daily. Compare important templates and journeys with the existing site.
- Plan and release. Set a content freeze if needed, take fresh backups, repeat the rehearsed steps and validate the live site. Monitor errors and key journeys after launch.
The order and tooling will vary by project. Do not treat this sequence as a substitute for Umbraco’s version-specific upgrade notes or testing in your own environment.
What if you cannot finish before December 2026?
Umbraco 13 reaches end of life on 14 December 2026. Umbraco offers Extended Long-Term Support (XLTS) as an option for teams that need more time. It provides a temporary window for security coverage while the upgrade or rebuild is completed; it does not remove the need for a migration plan. Review the current XLTS terms and your site’s risks before deciding whether it fits.
Frequently asked questions about Umbraco Upgrades
Can an Umbraco 13 website upgrade directly to Umbraco 17 without installing Versions 14, 15 and 16 first?
Yes. Umbraco supports a direct upgrade from Umbraco 13 LTS to Umbraco 17 LTS. You do not have to deploy Versions 14, 15 and 16 in sequence. Your team still needs to review the breaking changes introduced in those releases, especially the new backoffice architecture introduced in Version 14, and test the upgraded website before launch.
Will an Umbraco 13 to 17 upgrade migrate custom code and backoffice extensions automatically?
No. Umbraco can run its core database migrations when the upgraded application starts, but it will not rewrite your custom code or make incompatible packages work. Custom dashboards, property editors and other backoffice extensions may need to be rebuilt for the newer extension model. Review every package and custom feature, then test its behaviour in a copy of the website.
Is it better to upgrade an existing Umbraco 13 site or build a new Umbraco 17 site?
The choice depends on the website’s code, packages, content model and integrations. Upgrading the existing solution may be more direct when those parts are well maintained and compatible with Umbraco 17. A fresh solution may make more sense when backoffice extensions, architecture or content structures need substantial rework. Compare both routes after auditing the site; a fresh build still requires a planned content migration and testing.
Is Umbraco 17 the only supported version available to an Umbraco 13 website in September 2026?
No. As of September 2026, Umbraco 17 LTS and Umbraco 18 STS are both supported. Umbraco 17 is scheduled to reach end of life on 27 November 2028; Umbraco 18 on 25 June 2027. Version 17 suits a team seeking a longer support window. Version 18 may suit a project that needs its new Library and Elements features now and can plan for the shorter support cycle. Check package compatibility and current release guidance before choosing a target.
Start with the site you have
The useful first question is not simply, “Can Umbraco 13 upgrade to 17?” It can. The useful question is what your website needs to change for that move to be reliable.
If you are planning the work, ask Iconnect Digital to assess your Umbraco upgrade. Share your current version, packages, custom backoffice features, integrations and target date. We can review the likely route and scope before development begins.